|
Schedule of Regulations |
|||||||||||
| Permitted Principal Use | Permitted Accessory Use | Uses permitted by Special Permit by the Board of Appeals | Minimum Lot Area (square feet) | Minimum Lot Width (feet) | Minimum Lot Depth (feet) | Maximum Lot Coverage (percent of area) | Minimum Floor Area (square feet) | Maximum Structure Height (feet) | Minimum Front |
Setback Side |
(feet)² Rear |
| Manufacturing, assembly or other industrial operation; warehouse for enclosed storage of goods and materials; distribution plant; wholesale business; lumberyard and similar storage area; fuel supply depot; sand an gravel processing; cement manufacturing; electric power plant; automobile salvage operations Uses permitted by Planning Board | Accessory buildings or use customarily incidental to principal use; public utility use as defined in §149-5; signs as regulated by the Town of Moreau | 80,000 | 200 | 200 | 60% | None | 60 | 50 | 40 | 50 | |
| Same as R-2 plus: 1 family dwelling with permitted accessory uses | 22,500 with public water; 32,500 without public water | 125 | 125 | 25% | 800 | 30 | 40 | 15 | 30 | ||
| 2-fammily dwelling with permitted accessory use | 1 acre | 175 | 175 | 25% | 1,200 | 30 | 40 | 15 | 30 | ||
| Telecommunication towers and/or related eqiuptemtnet³ | 1 acreº | 200 | 200 | 60% | None | 120 | See Note 0 | ||||
Notes: ¹Site plan review by
the Planning Board required for all multifamily uses in the CC-1 District 5-25-98
²A
one-hundred-foot setback is required next to any residential district or
use. Also, fencing and/or plantings shall be required next to residential
districts or uses.
³Telecommunication towers require special use
permit by the Planning Board.